Kenya Electricity Transmission has awarded Adani Group and Africa50 a public-private partnership to construct high-voltage power lines worth $1.3 billion without needing loans. However, many Kenyans are angered by another proposal granting Adani Group a 30-year concession to manage the country’s largest airport, leading to protests from aviation workers.
Related Posts
Adani Group stocks rise as Adani Power surges over 19%
- staff
- January 14, 2025
- 0
Adani Group stocks experienced a significant recovery on Tuesday, with Adani Power leading the surge by 19.29%. Other notable increases included Adani Green Energy, Adani […]
MG’s China connection prompts scrutiny for PLI benefit for EV manufacturing
MG Motor’s expansion plans for electric vehicle manufacturing in India face delay due to scrutiny by an inter-ministerial panel. Changes in ownership structure, with a […]
ATM cash deposit limit: What is the latest daily cash deposit limit for HDFC Bank, SBI, PNB, Union Bank of India & Bank of Baroda at ATMs? Check here
The Automated Deposit cum Withdrawal Machine (ADWM) is a specialized ATM that allows customers to deposit cash into their accounts using their ATM or debit […]